Main pipes
In connection with construction of a 16.6 MWt solar heat and biomass plant in Denmark, Norisol carried out insulation of the pipes carrying the heat transporting medium. The correct type of insulation meant that the internal temperature of 312°C was maintained and the most efficient utilisation of the heat was obtained for electricity and heating.

Technical Room
The heat is conducted from the solar plant into the heat exchanger system and here as well there was need for the right amount of insulation in order to reduce waste heat.
The complex pipe system required a lot of adjustments and modifications of the insulation material which consists of pipe sections and insulation pads.

In addition to the insulation work, Norisol also supplied and installed 1,400 custom-made stainless steel elbows and other fittings i various sizes.

PROJECT DATA

Time of Execution:
2016

Details:
Insulation of 2 kilometes main pipes and 400 metres connection pipes for new solar and biomass plant in Brønderslev, Denmark.
Norisol produced and installed 1,400 stainless steel elbows for this project.
Custom-made pipe sections and insulation pads were produced at Norisol’s sheet metal and sewing workshops.