Norisol A/S
-
Copenhagen Airport
2018
THT Architects

A 100 meter long walkway has been built at first floor height in the middle of the terminal, so travelers can walk directly from the metro to either the security checkpoint or SAS fast track.
The bridge is a crucial part of the major redevelopment and expansion of Terminal 3. A new floor has been laid and a new exit from baggage has been built.
The new walkway is 5 meters wide and 100 meters long. This makes it Denmark's longest indoor walkway. It is built in three stages and is supported by the existing columns.
Bladt Industries from Aalborg is the main contractor on the complex construction and has chosen us as a subcontractor.
The new walkway is built in the beating heart of the airport, making it a difficult operation to complete. But Bladt industries chose us as their supplier, partly because we can offer a process that causes the least possible disruption to the terminal area.