Insulation, paneling, ceilings, furniture
2020
Orskov Yard

Rebuilding a 100 meter fishing vessel
- More than 25,000 working hours
- 9 months
- 8-38 on/off crew
- Insulation, ventilation, outfitting, access work, drawings
- 2200 m2 of marine panels finished with stainless steel angles and joints
- 200 m2 outfitting update
- Floors
- Ceilings
- Walls
- Loose furniture
- Self-produced fixed furniture
Insulation:
- Rockwool
- Armaflex
- Mixing bowls
- Isover slat insulation
- 28+ tons of foam
Areas on the ship:
- Freezing systems
- RSW plant
- Factory tires
- HVAC systems
- Outfitting