Conversion of 100 meter fishing vessel

Insulation, paneling, ceilings, furniture

2020

Orskov Yard

Rebuilding a 100 meter fishing vessel

  • More than 25,000 working hours
  • 9 months
  • 8-38 on/off crew
  • Insulation, ventilation, outfitting, access work, drawings
  • 2200 m2 of marine panels finished with stainless steel angles and joints
  • 200 m2 outfitting update
    • Floors
    • Ceilings
    • Walls
    • Loose furniture
    • Self-produced fixed furniture

Insulation:

  • Rockwool
  • Armaflex
  • Mixing bowls
  • Isover slat insulation
  • 28+ tons of foam

Areas on the ship:

  • Freezing systems
  • RSW plant
  • Factory tires
  • HVAC systems
  • Outfitting