Insulation, paneling, ceilings, furniture
2020
Orskov Yard
			Rebuilding a 100 meter fishing vessel
- More than 25,000 working hours
 - 9 months
 - 8-38 on/off crew
 - Insulation, ventilation, outfitting, access work, drawings
 - 2200 m2 of marine panels finished with stainless steel angles and joints
 - 200 m2 outfitting update
- Floors
 - Ceilings
 - Walls
 - Loose furniture
 - Self-produced fixed furniture
 
 
Insulation:
- Rockwool
 - Armaflex
 - Mixing bowls
 - Isover slat insulation
 - 28+ tons of foam
 
Areas on the ship:
- Freezing systems
 - RSW plant
 - Factory tires
 - HVAC systems
 - Outfitting
 